Material Prerequisites
Hardware is the only truth. Physics governs the cost of sterile compounding and semiconductor fabrication. DryR systems manage humidity and temperature to keep processes stable.
- ISO 7 airlock rooms for high-sterility zones
- ISO 8 anterooms and preparation spaces
- Vertiv CoolChip CDUs for high-density thermal management
- Prefabricated Power Skids to reduce site work
- Climate control portfolios for lithium battery production
Deployment Workflow
- Secure heavy industrial zoning, such as the Flourens industrial zone in France, to support high-tech manufacturing.
- Allocate specific infrastructure capital; for example, EREMS dedicated €6.7m of a €10m investment specifically to infrastructure.
- Layer climate controls using specialized portfolios to handle the moisture sensitivity of pharmaceuticals or micro-electronics.
- Install modular walls to avoid building modifications, utilizing factory-tested units like those delivered by Airkey to the US.
- Scale power and cooling via integrated infrastructure, leveraging systems like Vertiv SmartRun to cut deployment time by 50% to 85%.
Regional logistics create operational friction. Modular units from China reach US pharmacies quickly. Fixed sites in France require massive €10m investments for 4,000 sqm of space.

"Asia continues to be one of the fastest-growing regions for AI and digital infrastructure investment."— Giordano Albertazzi, CEO of Vertiv
| Facility/Project | Key Metric | Focus Area |
|---|---|---|
| EREMS (France) | 450 sqm cleanroom | Space Equipment |
| Vertiv (Johor) | 50-85% faster deploy | AI Data Centers |
| Airkey (US) | ISO 7/8 Modular | Sterile Compounding |
The Prefab Advantage
Field-tested reality shows that prefabricated infrastructure is the only way to keep pace with AI adoption. Traditional builds cannot meet the current deployment velocity.
Common Pitfalls
Static planning fails. Malaysia recently overtook Vietnam for second place in the Asia Manufacturing Index 2026. Firms clinging to 2024 footprints will find their logistics obsolete.

Precision is binary. One leak in a dry room ruins a battery batch. Hardware must be tested before it leaves the factory.